When a clothing brand develops a garment, the finished product is made from much more than just the main fabric.
A T-shirt may need fabric, rib, sewing thread, labels, printing, packaging, and hang tags.
A hoodie may also require drawcords, eyelets, zippers, elastic, and additional trims.
To keep all these materials organized, garment manufacturers use a document called a Bill of Materials, commonly known as a BOM.
For new clothing brands, understanding the BOM is important because it helps control sourcing, costing, quality, and production accuracy.
This guide explains what a Bill of Materials is, what information it contains, how it is used in garment manufacturing, and why it is an important part of the tech pack.
What Is a Bill of Materials in Garment Manufacturing?
A Bill of Materials (BOM) is a structured list of all the materials, trims, accessories, labels, and packaging items required to manufacture a garment.
It acts like a complete material checklist for the product.
For example, a T-shirt BOM may include:
-
Main fabric
-
Neck rib
-
Sewing thread
-
Main label
-
Size label
-
Care label
-
Print
-
Hang tag
-
Polybag
A hoodie BOM may include:
-
Main fleece fabric
-
Rib
-
Drawcord
-
Eyelets
-
Zipper
-
Thread
-
Labels
-
Printing or embroidery
-
Hang tag
-
Polybag
The BOM helps ensure that every required component is identified before bulk production begins.
Why Is a BOM Important?
Garment manufacturing involves multiple materials from different suppliers.
Without a clear BOM, important components can be forgotten or incorrectly sourced.
A BOM helps with:
-
Material planning
-
Costing
-
Supplier communication
-
Purchasing
-
Production preparation
-
Quality control
-
Inventory management
It also helps different teams work from the same information.
For example, the merchandiser, sourcing team, factory, and quality team can all refer to the same BOM.
BOM vs Tech Pack: What Is the Difference?
A BOM is usually one part of a garment tech pack.
A tech pack may include:
-
Garment sketches
-
Measurements
-
Construction details
-
Fabric specifications
-
Colour information
-
Print details
-
Label placement
-
Packaging
-
BOM
The BOM focuses specifically on what materials are required.
The rest of the tech pack explains how the garment should be made.
So:
Tech Pack = Full Production Specification
BOM = Material List Inside the Tech Pack
What Information Is Usually Included in a BOM?
A garment BOM may contain several columns.
Common fields include:
-
Item number
-
Material category
-
Material description
-
Colour
-
Size
-
Quantity
-
Unit of measurement
-
Supplier
-
Supplier code
-
Approved reference
-
Cost
The exact format depends on the company or factory.
Example of a Simple T-Shirt BOM
| Item | Description | Colour | Specification | Quantity |
|---|---|---|---|---|
| Main Fabric | Cotton Single Jersey | Black | 220 GSM | As required |
| Neck Rib | 1×1 Rib | Black | Match body | As required |
| Sewing Thread | Polyester Thread | Black | Matching shade | As required |
| Main Label | Woven Brand Label | Black/White | 5 × 2 cm | 1 pc |
| Size Label | Satin Label | Black | S–XXL | 1 pc |
| Care Label | Printed Satin | White | Care details | 1 pc |
| Screen Print | White | Front chest | 1 pc | |
| Hang Tag | Printed Card | Black | Brand artwork | 1 pc |
| Polybag | Transparent LDPE | Clear | Garment size | 1 pc |
This is only an example.
Actual BOM details depend on the garment.
1. Main Fabric in the BOM
The main fabric is usually the most important line item.
The BOM should clearly identify:
-
Fabric name
-
Fibre composition
-
GSM
-
Width or DIA
-
Colour
-
Finish
-
Supplier
For example:
Fabric: Polyester Interlock
Composition: 100% Polyester
GSM: 160
DIA: 60
Colour: Navy
Finish: Quick-dry
Clear fabric information helps prevent incorrect sourcing.
2. Secondary Fabrics
Some garments use more than one fabric.
Examples include:
-
Rib
-
Mesh
-
Lining
-
Contrast panels
-
Pocket lining
-
Cuff fabric
These should be listed separately.
For example, a sports T-shirt may use:
-
Main polyester interlock
-
Mesh side panels
-
Rib neckline
All three belong in the BOM.
3. Sewing Thread
Thread should also be included.
Important details may include:
-
Thread type
-
Colour
-
Supplier
-
Count or specification
For example:
Polyester sewing thread – black – matching body shade
Different garment areas may use different thread types.
4. Labels in the BOM
A garment can contain several labels.
Common examples include:
-
Main label
-
Size label
-
Care label
-
Composition label
-
Country-of-origin label
Each label should be listed separately if needed.
The BOM can specify:
-
Material
-
Size
-
Colour
-
Artwork
-
Placement reference
5. Zippers
Zippers should be clearly defined.
Details may include:
-
Type
-
Length
-
Colour
-
Material
-
Supplier
-
Slider type
For example:
No. 5 nylon coil zipper – 65 cm – black
A vague entry such as “black zipper” is not specific enough.
6. Buttons
Button information may include:
-
Material
-
Size
-
Colour
-
Number of holes
-
Branding
-
Quantity per garment
For a polo shirt, for example:
3 plastic buttons – 14L – matching body colour
7. Drawcords
For hoodies, joggers, and shorts, the BOM may include drawcord information.
Specify:
-
Material
-
Shape
-
Diameter
-
Length
-
Colour
-
Tip style
For example:
Round polyester drawcord – black – 120 cm – metal aglets
8. Eyelets
Eyelets should also be listed.
Specify:
-
Material
-
Size
-
Finish
-
Colour
Example:
Metal eyelet – 8 mm – matte black
9. Elastic
Elastic is commonly used in:
-
Waistbands
-
Cuffs
-
Sportswear
-
Innerwear
The BOM may specify:
-
Width
-
Stretch
-
Material
-
Length per garment
For example:
40 mm knitted elastic – black
10. Printing
Printing can also be listed in the BOM.
The entry may include:
-
Print method
-
Colour
-
Size
-
Artwork reference
-
Placement
For example:
Screen print – white – 20 × 25 cm – centre front
This helps connect artwork requirements with costing and production.
11. Embroidery
Embroidery can be included in the same way.
Details may include:
-
Logo size
-
Thread colour
-
Stitch count
-
Placement
Example:
Left chest embroidery – 6 cm wide – white thread
12. Hang Tags
Hang tags are often included in the BOM.
Specify:
-
Material
-
Size
-
Artwork
-
String
-
Quantity
For example:
300 GSM printed hang tag – 5 × 9 cm – black string
13. Packaging Materials
Packaging may also appear in the BOM.
Common packaging items include:
-
Polybag
-
Size sticker
-
Barcode
-
Tissue paper
-
Shipping box
-
Carton
For example:
1 transparent polybag per garment
1 size sticker per polybag
Why Quantity Is Important in a BOM
A BOM should show how much of each material is needed.
For countable items, this is simple.
Example:
-
1 main label
-
1 care label
-
3 buttons
-
2 eyelets
For fabric and thread, the quantity may be calculated differently.
Fabric may be shown in:
-
Kg
-
Metres
-
Yards
-
Consumption per garment
This information supports material planning and costing.
Units of Measurement in a BOM
A BOM may use different units depending on the material.
Common units include:
-
Kg
-
Metre
-
Yard
-
Piece
-
Pair
-
Set
-
Cone
-
Roll
For example:
Fabric = Kg
Buttons = Pieces
Elastic = Metres
Labels = Pieces
Using correct units prevents purchasing errors.
Supplier Information in a BOM
The BOM may include supplier information.
This can include:
-
Supplier name
-
Supplier code
-
Contact
-
Article number
-
Material reference
This helps factories reorder the same approved material.
For example:
Supplier: XYZ Trims
Article Code: ZIP-065-BLK
This is much safer than relying on memory.
Why Colour References Matter
Colour should be clearly documented.
Instead of writing:
Green
use:
-
Pantone reference
-
Supplier colour code
-
Approved swatch
-
Lab dip reference
For example:
Olive Green – Pantone 18-0527 TCX
Accurate colour references help keep different trims visually consistent.
BOM and Garment Costing
The BOM is a major input for garment costing.
Each material has a cost.
For example:
| Material | Example Cost |
|---|---|
| Main Fabric | ₹110 |
| Rib | ₹8 |
| Thread | ₹4 |
| Labels | ₹10 |
| ₹35 | |
| Hang Tag | ₹5 |
| Packaging | ₹10 |
| Material Cost | ₹182 |
This is only an example.
The manufacturer can then add:
-
Cutting
-
Stitching
-
Finishing
-
Overheads
-
Wastage
This helps calculate the total garment cost.
BOM and Sourcing
The sourcing team uses the BOM to identify what must be purchased.
For example:
Before production begins, they need to ensure availability of:
-
500 kg fabric
-
5,000 labels
-
10,000 buttons
-
5,000 polybags
The BOM becomes a purchasing reference.
BOM and Inventory Planning
A clear BOM also supports inventory planning.
Factories can track:
-
Required quantity
-
Available stock
-
Pending orders
-
Shortages
This reduces the risk of production delays.
BOM and Quality Control
The quality team can use the BOM to verify that the correct materials were used.
For example:
The BOM specifies:
Matte black eyelet
But production uses:
Shiny silver eyelet
That is a material mismatch.
Without a BOM, this error may be missed.
BOM and Sample Development
The BOM should be reviewed during sampling.
The proto sample may use temporary materials.
But by the pre-production sample stage, the final approved BOM should ideally be used.
This helps ensure:
-
Correct trims
-
Correct labels
-
Correct colours
-
Correct packaging
BOM Revision Control
BOMs can change during development.
For example:
Version 1:
Plastic zipper
Version 2:
Metal zipper
Version 3:
Branded zipper puller added
Changes should be recorded clearly.
A revision table can include:
| Version | Date | Change |
|---|---|---|
| V1 | 01-10-2026 | Initial BOM |
| V2 | 04-10-2026 | Zipper updated |
| V3 | 08-10-2026 | Label size changed |
This helps everyone use the latest information.
Why Version Control Is Important
Imagine the merchandiser is using BOM V3, but the factory is still using BOM V1.
The result could be:
-
Wrong zipper
-
Wrong label
-
Wrong packaging
Version control prevents this.
Always mark the latest approved BOM clearly.
Simple BOM Workflow
A garment BOM usually follows this process:
Design → Tech Pack → Initial BOM → Sample → Material Changes → Revised BOM → PP Sample → Final BOM → Bulk Production
The BOM evolves as the garment develops.
Example BOM for a Hoodie
A hoodie may include:
| Item | Description |
|---|---|
| Main Fabric | Cotton-Polyester Fleece |
| Rib | 2×2 Rib |
| Thread | Polyester Thread |
| Drawcord | Round Cotton Cord |
| Eyelets | Matte Black Metal |
| Zipper | Nylon Coil Zipper |
| Main Label | Woven Label |
| Size Label | Satin Label |
| Care Label | Printed Satin |
| DTF Back Print | |
| Hang Tag | Printed Card |
| Polybag | Transparent |
This is much more detailed than simply writing “hoodie materials.”
Example BOM for a Polo Shirt
A polo BOM may include:
-
Piqué main fabric
-
Collar
-
Cuff
-
Buttons
-
Thread
-
Main label
-
Size label
-
Care label
-
Hang tag
-
Polybag
Each item should have its own specification.
Example BOM for Sportswear
A sportswear BOM may include:
-
Polyester interlock
-
Mesh
-
Elastic
-
Heat-transfer label
-
Reflective trim
-
Zipper
-
Thread
-
Print
-
Packaging
Performance garments often require more technical material details.
Standard BOM vs Detailed BOM
A basic BOM may only include:
-
Material name
-
Colour
-
Quantity
A detailed BOM may include:
-
Supplier
-
Article code
-
Composition
-
Size
-
Finish
-
Unit
-
Consumption
-
Cost
-
Approval status
Larger brands and more complex products usually require more detailed BOMs.
Common BOM Mistakes New Clothing Brands Make
1. Missing Materials
Small items such as:
-
Size labels
-
Thread
-
Stickers
-
Eyelets
are sometimes forgotten.
Every production component should be listed.
2. Vague Descriptions
“Black zipper” is too vague.
Specify:
-
Type
-
Size
-
Length
-
Finish
3. No Colour Reference
General colour names can create shade differences.
Use an approved reference.
4. Missing Quantities
The factory must know how much is required per garment.
5. Wrong Units
Confusing pieces, metres, and kilograms can create purchasing mistakes.
6. No Supplier Reference
Custom materials can be difficult to reorder without supplier codes.
7. Poor Version Control
An outdated BOM can create production errors.
How New Clothing Brands Can Create a Simple BOM
If you are creating your first product, start with a simple spreadsheet.
Use columns such as:
| No. | Category | Description | Colour | Specification | Qty | Supplier |
|---|
Then list every material required for the garment.
For example:
-
Main fabric
-
Rib
-
Thread
-
Main label
-
Size label
-
Care label
-
Print
-
Hang tag
-
Polybag
You can make the BOM more detailed as your business grows.
BOM Checklist Before Production
Before approving production, check:
-
Is every material listed?
-
Are fabric details correct?
-
Are trim colours approved?
-
Are sizes correct?
-
Are quantities correct?
-
Are supplier codes included?
-
Are labels approved?
-
Is packaging included?
-
Is the latest revision being used?
A five-minute BOM review can prevent expensive mistakes.
BOM and Low MOQ Clothing Production
Small brands often produce low quantities.
In this situation, BOM planning becomes even more important.
Custom trims may require higher MOQs than the garment order.
For example:
You need:
100 hoodies
But the custom label supplier requires:
1,000 labels
The BOM helps reveal these sourcing challenges early.
Brands can then decide whether to:
-
Use standard trims
-
Order extra inventory
-
Change suppliers
-
Simplify the product
BOM and Sustainable Sourcing
Brands interested in lower-impact production can also use the BOM to track material choices.
Examples include:
-
Recycled polyester thread
-
Recycled labels
-
FSC-certified paper tags
-
Reduced-plastic packaging
-
Recycled fabric
Supplier documentation should support sustainability claims where applicable.
Why a BOM Helps Manufacturers Quote More Accurately
A manufacturer cannot provide an accurate price if materials are unclear.
Compare:
Option A: “I need a hoodie.”
versus:
Option B: “I need a 300 GSM fleece hoodie with 2×2 rib, metal eyelets, cotton drawcord, DTF back print, woven label, and individual polybag.”
The second request gives the manufacturer far more information.
A clear BOM leads to better costing.
Frequently Asked Questions
What does BOM mean in garment manufacturing?
BOM means Bill of Materials. It is a complete list of materials, trims, accessories, labels, and packaging required to manufacture a garment.
Is fabric included in the BOM?
Yes.
Main fabric and any secondary fabrics should be listed.
Are labels included in the BOM?
Yes.
Main labels, care labels, size labels, and other required labels are commonly included.
Is packaging part of the BOM?
It can be.
Many garment BOMs include polybags, stickers, hang tags, and other packaging materials.
Is a BOM the same as a tech pack?
No.
The BOM is one section of the tech pack.
The tech pack contains broader technical information about the entire garment.
Who creates the BOM?
The BOM may be created by:
-
Designer
-
Technical designer
-
Merchandiser
-
Product developer
-
Manufacturer
The final version should be approved before production.
Can a BOM change during sampling?
Yes.
Materials may change based on:
-
Cost
-
Availability
-
Quality
-
Design
All changes should be recorded.
Why is BOM important for costing?
The BOM lists all the materials that must be purchased, making it easier to calculate the product’s material cost.
Final Thoughts
A Bill of Materials may look like a simple spreadsheet, but it plays a major role in garment manufacturing.
It tells the manufacturer exactly which materials are required to build the product.
A good BOM helps control:
-
Fabric
-
Trims
-
Labels
-
Colours
-
Quantities
-
Suppliers
-
Cost
-
Packaging
It also connects several important parts of the production process, including sourcing, sampling, costing, purchasing, and quality control.
For new clothing brands, the BOM does not need to be complicated.
Start with a clear list of every material used in the garment and make the information more detailed as your products become more complex.
Most importantly, keep the BOM updated.
If the manufacturer knows exactly what materials are required, there is less room for confusion during production.