Blog
Explore expert guides on polyester fabrics, T-shirt fabrics, GSM, DIA, fabric selection, garment sourcing and textile trends from Walrus Yes India Can, Tiruppur.
Blog
What Is a Bill of Materials (BOM) in Garment Manufacturing? A Beginner’s Guide
When a clothing brand develops a garment, the finished product is made from much more than just the main fabric.
A T-shirt may need fabric, rib, sewing thread, labels, printing, packaging, and hang tags.
A hoodie may also require drawcords, eyelets, zippers, elastic, and additional trims.
To keep all these materials organized, garment manufacturers use a document called a Bill of Materials, commonly known as a BOM.
For new clothing brands, understanding the BOM is important because it helps control sourcing, costing, quality, and production accuracy.
This guide explains what a Bill of Materials is, what information it contains, how it is used in garment manufacturing, and why it is an important part of the tech pack.
What Is a Bill of Materials in Garment Manufacturing?
A Bill of Materials (BOM) is a structured list of all the materials, trims, accessories, labels, and packaging items required to manufacture a garment.
It acts like a complete material checklist for the product.
For example, a T-shirt BOM may include:
Main fabric
Neck rib
Sewing thread
Main label
Size label
Care label
Print
Hang tag
Polybag
A hoodie BOM may include:
Main fleece fabric
Rib
Drawcord
Eyelets
Zipper
Thread
Labels
Printing or embroidery
Hang tag
Polybag
The BOM helps ensure that every required component is identified before bulk production begins.
Why Is a BOM Important?
Garment manufacturing involves multiple materials from different suppliers.
Without a clear BOM, important components can be forgotten or incorrectly sourced.
A BOM helps with:
Material planning
Costing
Supplier communication
Purchasing
Production preparation
Quality control
Inventory management
It also helps different teams work from the same information.
For example, the merchandiser, sourcing team, factory, and quality team can all refer to the same BOM.
BOM vs Tech Pack: What Is the Difference?
A BOM is usually one part of a garment tech pack.
A tech pack may include:
Garment sketches
Measurements
Construction details
Fabric specifications
Colour information
Print details
Label placement
Packaging
BOM
The BOM focuses specifically on what materials are required.
The rest of the tech pack explains how the garment should be made.
So:
Tech Pack = Full Production Specification
BOM = Material List Inside the Tech Pack
What Information Is Usually Included in a BOM?
A garment BOM may contain several columns.
Common fields include:
Item number
Material category
Material description
Colour
Size
Quantity
Unit of measurement
Supplier
Supplier code
Approved reference
Cost
The exact format depends on the company or factory.
Example of a Simple T-Shirt BOM
Item
Description
Colour
Specification
Quantity
Main Fabric
Cotton Single Jersey
Black
220 GSM
As required
Neck Rib
1×1 Rib
Black
Match body
As required
Sewing Thread
Polyester Thread
Black
Matching shade
As required
Main Label
Woven Brand Label
Black/White
5 × 2 cm
1 pc
Size Label
Satin Label
Black
S–XXL
1 pc
Care Label
Printed Satin
White
Care details
1 pc
Print
Screen Print
White
Front chest
1 pc
Hang Tag
Printed Card
Black
Brand artwork
1 pc
Polybag
Transparent LDPE
Clear
Garment size
1 pc
This is only an example.
Actual BOM details depend on the garment.
1. Main Fabric in the BOM
The main fabric is usually the most important line item.
The BOM should clearly identify:
Fabric name
Fibre composition
GSM
Width or DIA
Colour
Finish
Supplier
For example:
Fabric: Polyester InterlockComposition: 100% PolyesterGSM: 160DIA: 60Colour: NavyFinish: Quick-dry
Clear fabric information helps prevent incorrect sourcing.
2. Secondary Fabrics
Some garments use more than one fabric.
Examples include:
Rib
Mesh
Lining
Contrast panels
Pocket lining
Cuff fabric
These should be listed separately.
For example, a sports T-shirt may use:
Main polyester interlock
Mesh side panels
Rib neckline
All three belong in the BOM.
3. Sewing Thread
Thread should also be included.
Important details may include:
Thread type
Colour
Supplier
Count or specification
For example:
Polyester sewing thread – black – matching body shade
Different garment areas may use different thread types.
4. Labels in the BOM
A garment can contain several labels.
Common examples include:
Main label
Size label
Care label
Composition label
Country-of-origin label
Each label should be listed separately if needed.
The BOM can specify:
Material
Size
Colour
Artwork
Placement reference
5. Zippers
Zippers should be clearly defined.
Details may include:
Type
Length
Colour
Material
Supplier
Slider type
For example:
No. 5 nylon coil zipper – 65 cm – black
A vague entry such as “black zipper” is not specific enough.
6. Buttons
Button information may include:
Material
Size
Colour
Number of holes
Branding
Quantity per garment
For a polo shirt, for example:
3 plastic buttons – 14L – matching body colour
7. Drawcords
For hoodies, joggers, and shorts, the BOM may include drawcord information.
Specify:
Material
Shape
Diameter
Length
Colour
Tip style
For example:
Round polyester drawcord – black – 120 cm – metal aglets
8. Eyelets
Eyelets should also be listed.
Specify:
Material
Size
Finish
Colour
Example:
Metal eyelet – 8 mm – matte black
9. Elastic
Elastic is commonly used in:
Waistbands
Cuffs
Sportswear
Innerwear
The BOM may specify:
Width
Stretch
Material
Length per garment
For example:
40 mm knitted elastic – black
10. Printing
Printing can also be listed in the BOM.
The entry may include:
Print method
Colour
Size
Artwork reference
Placement
For example:
Screen print – white – 20 × 25 cm – centre front
This helps connect artwork requirements with costing and production.
11. Embroidery
Embroidery can be included in the same way.
Details may include:
Logo size
Thread colour
Stitch count
Placement
Example:
Left chest embroidery – 6 cm wide – white thread
12. Hang Tags
Hang tags are often included in the BOM.
Specify:
Material
Size
Artwork
String
Quantity
For example:
300 GSM printed hang tag – 5 × 9 cm – black string
13. Packaging Materials
Packaging may also appear in the BOM.
Common packaging items include:
Polybag
Size sticker
Barcode
Tissue paper
Shipping box
Carton
For example:
1 transparent polybag per garment
1 size sticker per polybag
Why Quantity Is Important in a BOM
A BOM should show how much of each material is needed.
For countable items, this is simple.
Example:
1 main label
1 care label
3 buttons
2 eyelets
For fabric and thread, the quantity may be calculated differently.
Fabric may be shown in:
Kg
Metres
Yards
Consumption per garment
This information supports material planning and costing.
Units of Measurement in a BOM
A BOM may use different units depending on the material.
Common units include:
Kg
Metre
Yard
Piece
Pair
Set
Cone
Roll
For example:
Fabric = Kg
Buttons = Pieces
Elastic = Metres
Labels = Pieces
Using correct units prevents purchasing errors.
Supplier Information in a BOM
The BOM may include supplier information.
This can include:
Supplier name
Supplier code
Contact
Article number
Material reference
This helps factories reorder the same approved material.
For example:
Supplier: XYZ TrimsArticle Code: ZIP-065-BLK
This is much safer than relying on memory.
Why Colour References Matter
Colour should be clearly documented.
Instead of writing:
Green
use:
Pantone reference
Supplier colour code
Approved swatch
Lab dip reference
For example:
Olive Green – Pantone 18-0527 TCX
Accurate colour references help keep different trims visually consistent.
BOM and Garment Costing
The BOM is a major input for garment costing.
Each material has a cost.
For example:
Material
Example Cost
Main Fabric
₹110
Rib
₹8
Thread
₹4
Labels
₹10
Print
₹35
Hang Tag
₹5
Packaging
₹10
Material Cost
₹182
This is only an example.
The manufacturer can then add:
Cutting
Stitching
Finishing
Overheads
Wastage
This helps calculate the total garment cost.
BOM and Sourcing
The sourcing team uses the BOM to identify what must be purchased.
For example:
Before production begins, they need to ensure availability of:
500 kg fabric
5,000 labels
10,000 buttons
5,000 polybags
The BOM becomes a purchasing reference.
BOM and Inventory Planning
A clear BOM also supports inventory planning.
Factories can track:
Required quantity
Available stock
Pending orders
Shortages
This reduces the risk of production delays.
BOM and Quality Control
The quality team can use the BOM to verify that the correct materials were used.
For example:
The BOM specifies:
Matte black eyelet
But production uses:
Shiny silver eyelet
That is a material mismatch.
Without a BOM, this error may be missed.
BOM and Sample Development
The BOM should be reviewed during sampling.
The proto sample may use temporary materials.
But by the pre-production sample stage, the final approved BOM should ideally be used.
This helps ensure:
Correct trims
Correct labels
Correct colours
Correct packaging
BOM Revision Control
BOMs can change during development.
For example:
Version 1:
Plastic zipper
Version 2:
Metal zipper
Version 3:
Branded zipper puller added
Changes should be recorded clearly.
A revision table can include:
Version
Date
Change
V1
01-10-2026
Initial BOM
V2
04-10-2026
Zipper updated
V3
08-10-2026
Label size changed
This helps everyone use the latest information.
Why Version Control Is Important
Imagine the merchandiser is using BOM V3, but the factory is still using BOM V1.
The result could be:
Wrong zipper
Wrong label
Wrong packaging
Version control prevents this.
Always mark the latest approved BOM clearly.
Simple BOM Workflow
A garment BOM usually follows this process:
Design → Tech Pack → Initial BOM → Sample → Material Changes → Revised BOM → PP Sample → Final BOM → Bulk Production
The BOM evolves as the garment develops.
Example BOM for a Hoodie
A hoodie may include:
Item
Description
Main Fabric
Cotton-Polyester Fleece
Rib
2×2 Rib
Thread
Polyester Thread
Drawcord
Round Cotton Cord
Eyelets
Matte Black Metal
Zipper
Nylon Coil Zipper
Main Label
Woven Label
Size Label
Satin Label
Care Label
Printed Satin
Print
DTF Back Print
Hang Tag
Printed Card
Polybag
Transparent
This is much more detailed than simply writing “hoodie materials.”
Example BOM for a Polo Shirt
A polo BOM may include:
Piqué main fabric
Collar
Cuff
Buttons
Thread
Main label
Size label
Care label
Hang tag
Polybag
Each item should have its own specification.
Example BOM for Sportswear
A sportswear BOM may include:
Polyester interlock
Mesh
Elastic
Heat-transfer label
Reflective trim
Zipper
Thread
Print
Packaging
Performance garments often require more technical material details.
Standard BOM vs Detailed BOM
A basic BOM may only include:
Material name
Colour
Quantity
A detailed BOM may include:
Supplier
Article code
Composition
Size
Finish
Unit
Consumption
Cost
Approval status
Larger brands and more complex products usually require more detailed BOMs.
Common BOM Mistakes New Clothing Brands Make
1. Missing Materials
Small items such as:
Size labels
Thread
Stickers
Eyelets
are sometimes forgotten.
Every production component should be listed.
2. Vague Descriptions
“Black zipper” is too vague.
Specify:
Type
Size
Length
Finish
3. No Colour Reference
General colour names can create shade differences.
Use an approved reference.
4. Missing Quantities
The factory must know how much is required per garment.
5. Wrong Units
Confusing pieces, metres, and kilograms can create purchasing mistakes.
6. No Supplier Reference
Custom materials can be difficult to reorder without supplier codes.
7. Poor Version Control
An outdated BOM can create production errors.
How New Clothing Brands Can Create a Simple BOM
If you are creating your first product, start with a simple spreadsheet.
Use columns such as:
No.
Category
Description
Colour
Specification
Qty
Supplier
Then list every material required for the garment.
For example:
Main fabric
Rib
Thread
Main label
Size label
Care label
Print
Hang tag
Polybag
You can make the BOM more detailed as your business grows.
BOM Checklist Before Production
Before approving production, check:
Is every material listed?
Are fabric details correct?
Are trim colours approved?
Are sizes correct?
Are quantities correct?
Are supplier codes included?
Are labels approved?
Is packaging included?
Is the latest revision being used?
A five-minute BOM review can prevent expensive mistakes.
BOM and Low MOQ Clothing Production
Small brands often produce low quantities.
In this situation, BOM planning becomes even more important.
Custom trims may require higher MOQs than the garment order.
For example:
You need:
100 hoodies
But the custom label supplier requires:
1,000 labels
The BOM helps reveal these sourcing challenges early.
Brands can then decide whether to:
Use standard trims
Order extra inventory
Change suppliers
Simplify the product
BOM and Sustainable Sourcing
Brands interested in lower-impact production can also use the BOM to track material choices.
Examples include:
Recycled polyester thread
Recycled labels
FSC-certified paper tags
Reduced-plastic packaging
Recycled fabric
Supplier documentation should support sustainability claims where applicable.
Why a BOM Helps Manufacturers Quote More Accurately
A manufacturer cannot provide an accurate price if materials are unclear.
Compare:
Option A: “I need a hoodie.”
versus:
Option B: “I need a 300 GSM fleece hoodie with 2×2 rib, metal eyelets, cotton drawcord, DTF back print, woven label, and individual polybag.”
The second request gives the manufacturer far more information.
A clear BOM leads to better costing.
Frequently Asked Questions
What does BOM mean in garment manufacturing?
BOM means Bill of Materials. It is a complete list of materials, trims, accessories, labels, and packaging required to manufacture a garment.
Is fabric included in the BOM?
Yes.
Main fabric and any secondary fabrics should be listed.
Are labels included in the BOM?
Yes.
Main labels, care labels, size labels, and other required labels are commonly included.
Is packaging part of the BOM?
It can be.
Many garment BOMs include polybags, stickers, hang tags, and other packaging materials.
Is a BOM the same as a tech pack?
No.
The BOM is one section of the tech pack.
The tech pack contains broader technical information about the entire garment.
Who creates the BOM?
The BOM may be created by:
Designer
Technical designer
Merchandiser
Product developer
Manufacturer
The final version should be approved before production.
Can a BOM change during sampling?
Yes.
Materials may change based on:
Cost
Availability
Quality
Design
All changes should be recorded.
Why is BOM important for costing?
The BOM lists all the materials that must be purchased, making it easier to calculate the product’s material cost.
Final Thoughts
A Bill of Materials may look like a simple spreadsheet, but it plays a major role in garment manufacturing.
It tells the manufacturer exactly which materials are required to build the product.
A good BOM helps control:
Fabric
Trims
Labels
Colours
Quantities
Suppliers
Cost
Packaging
It also connects several important parts of the production process, including sourcing, sampling, costing, purchasing, and quality control.
For new clothing brands, the BOM does not need to be complicated.
Start with a clear list of every material used in the garment and make the information more detailed as your products become more complex.
Most importantly, keep the BOM updated.
If the manufacturer knows exactly what materials are required, there is less room for confusion during production.